Datacenter Industry

Flood Risk Assessment

Flood risk assessment

Evaluating the potential for flooding in a particular area is a crucial process to understand the likelihood and potential impacts of flooding events. At Experiqs, we employ a combination of techniques to analyze various factors contributing to flood risk. And offer our client design solutions and develop measures to reduce flood risk and enhance resilience to flooding events.
What we offer
Explore our more services related to datacenter industry

Chilled water circuit hydraulic modelling to predict pressure losses and temperature

CRAC/PAHU/FWU failure scenario transient CFD analysis

Datacenter building generator room ventilation system

Flood risk assessment

Noise reduction analysis

Seismic analysis

Stress analysis

TES tank, buffer tank transient analysis

The data center building data hall cooling system internal CFD analysis and system optimization

The data center building external flow simulation with chillers, DG flue gases, and cooling tower