Datacenter Industry

CRAC or PAHU or FWU failure scenario transient CFD analysis

CRAC/PAHU/FWU failure scenario transient CFD analysis

CRAC (Computer Room Air Conditioning), PAHU (Precision Air Handling Units), and FWU (Fan Wall Units) are essential components in data center cooling systems, responsible for maintaining optimal temperatures to ensure efficient server functionality. At Experiqs, we employ advanced computational methods to analyze operating variables. And devise effective contingency plans and implement strategies to mitigate the impact of cooling system failures, ensuring uninterrupted operations and minimizing downtime.
What we offer
Explore our more services related to datacenter industry

Chilled water circuit hydraulic modelling to predict pressure losses and temperature

CRAC/PAHU/FWU failure scenario transient CFD analysis

Datacenter building generator room ventilation system

Flood risk assessment

Noise reduction analysis

Seismic analysis

Stress analysis

TES tank, buffer tank transient analysis

The data center building data hall cooling system internal CFD analysis and system optimization

The data center building external flow simulation with chillers, DG flue gases, and cooling tower